Vindkraftpark

High Coast Wind Farm

High Coast Wind Farm is a wind power project located in a challenging rock environment.

Norrbottens Bergteknik has been commissioned to carry out rock excavation and drilling work to prepare the site for the construction of the wind turbines.

The project placed high demands on planning, precision and coordination, both from a production and a health and safety perspective. The work was carried out in close consultation with the client and other parties on site, with a focus on safe working practices and efficient execution.

About the mission:

Location:
Sollefteå municipality
Year:
Apr 2024 – Dec 2024
Project:
High Coast Wind Farm
Responsible for:
Rock work and drilling.
Scope:
Rock excavation and drilling work as part of the preparation for the construction of the wind turbines.
Contact:
Klas Adolfsson
Site Manager Central Sweden
+46 (0)70-632 78 07

Switchboard:

+ 46 (0)929-109 10

Visiting address:

Löpevägen 16
SE-906 20, Umeå

Postal address:

Box 10
SE-942 21 Älvsbyn

Read our customer magazine: