Rock handling and construction work for industrial site in Tumba

A new industrial property is being built next to Norrbottens Bergteknik's office on Tuna gårdsväg in Tumba. In the project, we are responsible for rock handling, blasting and all construction work.
Rock handling work for the Twin Peaks wind farm project

Norrbottens Bergteknik has been commissioned to prepare the terrain in the Twin Peaks project, which involves drilling and rock excavation for roads, crane plans and wind power foundations.
Underwater blasting at Finnfors power station

The old and historic power station in Finnfors outside Skellefteå has been completely renovated to produce electricity again. Norrbottens Bergteknik has participated in the work with underwater blasting.
Sundsvall Logistics Park is a major project for the north of Sweden

Sundsvall Logistics Park is a major investment in transport, growth and the environment. The aim is for the park to become one of Sweden's most important transport hubs by linking road, rail and sea transport so that they meet in the same area. Norrbottens Bergteknik is responsible for unloading.
Drilling and blasting at SCA's billion-dollar investment in Obbola

When SCA in Obbola outside Umeå made its biggest factory investment to date, Norrbottens Bergteknik was involved in drilling and blasting work for the new plant.
Sensitive rock work at Norrlands University Hospital

When the rock work for the new Building 29 at the University Hospital in Umeå was carried out, precision and caution were in focus when the 60 metre long, 10 metre deep and 14 metre wide shaft for the culvert system was blasted out.